Keyence LK-G Series Uživatelský manuál Strana 43

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 198
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 42
1-23
1
LK-G-M-NO1-E
1 Before Use
Connecting the display panel
In the case of the separate type controller, the display panel cable is used for connecting the
controller to the display panel.
The LK-G series can be operated without the display panel. In addition, the operation from
a PC is possible by using the "LK-Navigator" software.
Connecting the power
Connect the 24V DC power to the terminals 1 and 2 of the 12-pin terminal block.
KEYENCE CA-U3 is recommended for the 24V DC power supply.
Connecting the terminal block
The steps to connect the wires to the terminal block are as follows:
1
Remove the terminal block from the controller.
Loosen the two screws with a screwdriver and pull it out.
2
Loosen the screws on the terminal with a screwdriver, and insert the lead wires
into the terminal block.
Approximately 6.5mm of the insulation should be striped from both wires.
3
Tighten the lead wires with the screwdriver.
After tightening them, pull the lead wires lightly to confirm that they are securely
fixed.
4
Install the terminal block to the controller.
Reference
Reference
Zobrazit stránku 42
1 2 ... 38 39 40 41 42 43 44 45 46 47 48 ... 197 198

Komentáře k této Příručce

Žádné komentáře